Monday (6/12/21)
- Slow rain.
- South side braces off shutters.
- West side braces off outside.
- Some West side braces off inside.
Tuesday (7/12/21)
- Slight drizzle of rain.
- Central pads poured for posts in warehouse.
- South boxing stripped.
Wednesday (8/12/21)
- West side outside bracing stripped.
- East and North boxing in place.
- Internal pad boxing stripped.
Thursday (9/12/21)
- East outside boxing levelled.
Friday (10/12/21)
- North outside boxing levelled.