Co-Mac Warehouse Build - Week 14

Continued progress as we conclude week 14 of the Co-Mac Warehouse Build. Learn about what happened this week...


Progress Summary

Monday (17/1/22)

- Tidy up site.

- Outside top line installed.


Tuesday (11/1/22)

- Poured concrete at 4.30pm/3 frames up.

- Gate put in at Waihi Road entance.

- Interior sand put in to base for floor.


Wednesday (12/1/22)

- Front portal up - CS H4.

- Kerry Lane gate sorted.

- Filling centre up and clearing outside are with gravel.


Thursday (13/1/22)

- Another truck load of steel arrived from Coresteel.

- Waihi gate access finished.

- East boxing pegs stripped.

- Posts in Kerry Lane fence for gates.


Friday (14/1/22)

- Outside east boxing stripped.

- Continuing to fill floor fase with material.

- Another truck of steel arrived from Coresteel.


Contractors:

Arthur Brown Construction - www.arthurbrown.co.nz

BTW Company - www.btw.nz

Custom Construction - www.customconstruction.co.nz

Drillco - www.drillco.co.nz

Taranaki Civil Construction - https://www.tccl.co.nz/



Weather Review
















Great buildings come from great people, and all challenges are solved by the execution of a good plan.